altloha.blogg.se

Space shuttle orbiter
Space shuttle orbiter








space shuttle orbiter

space shuttle orbiter space shuttle orbiter

These companies presented reports to NASA by November 1, 1969. Invitations were given to four aerospace contractors to present design proposals on re-usable and partially re-usable manned spacecraft. On January 31, 1969, NASA issued feasibility design study contracts for their “Integrated Launch and Re-entry Vehicle” (ILRV). Of course, history would prove otherwise. The words “cheap” and “routine” were the words which most closely matched the objectives for Space Shuttles as expressed by NASA. In addition, NASA believed that Space Shuttles could serve as multi-purpose satellite delivery vehicles with the potential to completely replace Atlas-Centaur, Delta and Titan rockets.

#Space shuttle orbiter plus#

The space station would support a plethora of scientific research objectives, plus act as an engineering and support base for manned journeys to the planets. presence in space following the Apollo lunar landings. The space station was intended to assure a permanent manned U.S. At the time, NASA envisioned a space station which would be staffed by 12 to 24 people. The first goal of the Space Shuttle program was to provide NASA with an efficient, re-usable method of carrying astronauts to and from a permanently manned space station. Space Shuttle Artist Conception, Photo Courtesy NASAīorn in 1968 at the height of the Apollo program, the Space Shuttle was designed to fulfill two basic roles in NASA post-Apollo manned flight objectives. By Cliff Lethbridge SPACE SHUTTLE PROGRAM HISTORY










Space shuttle orbiter